Badminton Courts, Asbestos Roof Replacement
This week we installed our 3-layer fall protection and debris containment system in a facility in Auckland City.
The system, comprising fall arrest nets overlain with fine-grade debris mesh and then a layer of heavy-duty plastic, was installed in a day to enable the courts to be used by members that evening.
By installing the 3-layer net system the centre is able to remain operational throughout the period of roof replacement, and not have to shut down whilst these potentially disruptive works are undertaken.
We continue to find that increasing numbers of clients see the benefit of the system we can provide, by ensuring that their work practices can continue unaffected whilst their roofs are replaced.
If you are contemplating replacing your old roof, and want to minimize disruption to your business, then just give us a call.
Until next time
Craig Daly
21 2024